Finally got my canvas enclosure done (mostly).
I’ve been busy getting Estrella ready for a cruise with my son, Dan
and his fiance, Olivia.
However, I had already begun the freezer thermostat job which lead to
the freezer pipeline insulation job so those had to get done.
Then there was the icing of the freezer line to deal with.
#img7 caption=’modified electrical box to contain odd freezer line
entry. The wire is for the temperature sensor’#
I also had to fix the quarter-birth AC ducting which was never
installed properly. That involved a way of securing the ducting to
the vent which is mounted on an aft access door in the back of the
quarter-birth.
Well, I finished up those jobs today and managed to replace the Joker
valves on the head (a yucky job). Head works great now, No visits
from what was flushed!
Estrella Sailing Vessel | All Rights Reserved.
Recent Comments