New Canvas, new freezer thermostat, new freezer line insulation

Finally got my canvas enclosure done (mostly).
I’ve been busy getting Estrella ready for a cruise with my son, Dan
and his fiance, Olivia.
However, I had already begun the freezer thermostat job which lead to
the freezer pipeline insulation job so those had to get done.
original layout of thermostat location

shuffling warning sign to make room

panel design sheet and completed panel

finished project

Then there was the icing of the freezer line to deal with.
icing caught in the act

#img7 caption=’modified electrical box to contain odd freezer line
entry. The wire is for the temperature sensor’#
I also had to fix the quarter-birth AC ducting which was never
installed properly. That involved a way of securing the ducting to
the vent which is mounted on an aft access door in the back of the
quarter-birth.
Well, I finished up those jobs today and managed to replace the Joker
valves on the head (a yucky job). Head works great now, No visits
from what was flushed!